The California State University Office of the Chancellor is seeking a vendor to provide monthly maintenance for their HVAC system. The maintenance should include 7-days, 24-hour emergency coverage, with a 2 hour response time, 365 days a year. The HVAC system is located at 401 Golden Shore, Long Beach, CA 90802 and supports approximately 150,000 square feet of interior office space. The contract was awarded to ACCO Engineered Systems.
• The contract is for prevailing wages.
• The contract includes maintenance and emergency coverage for the HVAC system.
• The HVAC system is divided into multiple zones controlled by Distech thermostats, VAV’s, and operating software.
• A job walk will be granted to the finalist prior to the commencement of services.