Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More energy and utilities bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Energy and Utilities
  5. ›Oxnard Wastewater Treatment Plant Variable Frequency Drive…

Awarded contract·City of Oxnard·California

Oxnard Wastewater Treatment Plant Variable Frequency Drive Replacement Project

Won by WDI Electric Co. +1 more$479kMultiple Award
Contract source

Awarded vendors

  • WDI Electric Co.
  • Yeh Electric Inc.

Description

The City of Oxnard invited sealed bids for the Oxnard Wastewater Treatment Plant Variable Frequency Drive Replacement Project. The project includes furnishing all necessary labor, materials, equipment, and other incidental and appurtenant work to replace two variable frequency drive units at the Oxnard Wastewater Treatment Plant. The bid submission date was August 21, 2018. • The project involves replacing two variable frequency drive units at the Oxnard Wastewater Treatment Plant. • The bid contact is Renee Hatcher, who can be reached at (805) 200-5289 or [email protected]. • The City of Oxnard reserves the right to reject all bids. • The contract documents include the bid specifications, contract terms, and conditions. • The bid results are available, with two companies listed: WDI Electric Co. and Yeh Electric Inc.

Attached files

Key dates

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Energy and Utilities
NAICS
221320
Solicitation №
PW 19-06

Contract value

$478,942

Based on the bid results, the total bid amount is $478,942.13, which can be used as an estimate of the contract value. This amount is likely to be the total cost of the project, including labor, materials, and equipment. However, without more detailed information on the contract terms and conditions, it is difficult to provide a more precise estimate.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Brazos Valley·Texas

Top match · 70%

Upgrade of VFD (Variable Frequency Drive) Control from NXGI to NXGPro+ system

Closes 11/17/2026Opened 10/26/2026

West Basin Municipal Water·California

68% match

Torrance Refinery Water Recycling Plant Programmable Logic Controller Replacements

Closes 11/5/2026Opened 9/23/2026

West Basin Municipal Water District·California

68% match

Torrance Refinery Water Recycling Plant Programmable Logic Controller Replacements

Closes 11/5/2026Opened 9/23/2026

Upper Occoquan Service Authority·Virginia

68% match

UOSA IFB 27-02 P2NR+ Construction

Closes 11/4/2026Opened 8/24/2026

City of Vallejo·California

66% match

Fleming Hill SCADA Fiber Replacement Project

Closes 11/19/2026Opened 10/29/2026

City of Santa Rosa·California

66% match

Secondary Clarifier No 1 Rehabilitation Project

Closes 11/10/2026Opened 9/29/2026

City of Riverside·California

65% match

SITE MODIFICATIONS AT THE PALMYRITA WATER TREATMENT PLANT FOR PFAS REMOVAL

Closes 11/24/2026Opened 10/15/2026

Contra Costa Water District·California

65% match

City of Brentwood Water Treatment Plant Actuator and Control System Upgrades

Closes 11/10/2026Opened 10/1/2026

City of Palm Springs·California

65% match

PALM SPRINGS WASTEWATER TREATMENT PLANT ODOR CONTROL IMPROVEMENTS

Closes 11/10/2026Opened 10/13/2026

City of Hollywood·Florida

65% match

Water Treatment Plant Maintenance Package 'B'; Project No. 25-4262

Closes 12/3/2026Opened 10/26/2026

City of Charlotte·North Carolina

65% match

McAlpine Creek WRRF Digesters Rehabilitation

Rolling / TBD closeOpened 7/15/2027

City of San Diego·California

65% match

Otay WTP Raw Water PS Switchboard Replacement - ADVERTISEMENT ONLY

Closes 12/8/2026Opened 10/28/2026

Town of Jupiter·Florida

65% match

RO Plant Improvements & Membrane Replacements (W2010)

Closes 11/10/2026Opened 10/6/2026

City of Douglas·Wyoming

65% match

Sanitary Sewer and Misc WWTP Improvements Project

Closes 11/3/2026Opened 10/16/2026

Town of Narragansett·Rhode Island

65% match

Stand-by Generator Replacement - WWTP

Closes 11/6/2026Opened 11/6/2026

City of Charlotte·North Carolina

64% match

McAlpine Wastewater Mgmt Facility Treatment Facilities Rehabilitation

Rolling / TBD closeOpened 8/3/2026

North Carolina Town of Cary·North Carolina

64% match

Swift Creek Pump Station PLC Improvements

Closes 11/9/2026Opened 10/15/2026

City of Fort Myers·Florida

64% match

Sole Source - 1 250 HP Motor and Nord Reducer

Closes 11/6/2026Opened 10/16/2026

City of Hollywood·Florida

64% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026

City of Charlotte·North Carolina

64% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

City of Long Prairie·Minnesota

64% match

Long Prairie, City of Water Treatment Plant Rehabilitation 25X.138024

Closes 11/18/2026Opened 10/29/2026

City of Fort Wayne·Indiana

64% match

Electrical Distribution Equipment

Closes 11/10/2026Opened 10/15/2026

City of San Clemente·California

64% match

WRP Grit Classifier Replacement Project

Closes 11/19/2026Opened 10/22/2026

City of Charlotte·North Carolina

64% match

McDowell Creek Wastewater Treatment Plant Clarifier & Pumping Station

Rolling / TBD closeOpened 1/1/2027

International Boundary And Water Commission: U.S.-Mexico·Texas

64% match

Operations and Maintenance (O&M) Services for the SBIWTP

Closes 1/6/2027Opened 9/25/2026