The contract is for the removal, rebuilding, and reinstallation of two heating circulation pumps at the Wyoming Medium Correctional Institution. The project was awarded to Tolin Mechanical for a total bid of $50,278.00. The contract was issued by the Wyoming State Construction Department, Procurement Section, on behalf of the Wyoming Department of Corrections. The scope of work includes the removal, rebuilding, and reinstallation of two Bell and Gossett HSC# 940 15 pumps.
• The project requires a mandatory pre-bid meeting, which was held on May 20, 2025.
• The bid submission deadline was June 11, 2025, at 1:00 p.m. Mountain Time.
• The contract requires a bid deposit of 10% of the total bid, which can be in the form of a bid bond, cashier's check, or certified check.
• The contractor is responsible for reviewing and complying with all applicable laws, regulations, and specifications.