Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Connecticut guideConnecticut Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Connecticut
  4. ›Water and Wastewater
  5. ›COLLINSVILLE WATER TREATMENT FACILITY BUTTERFLY VALVES AND…

Awarded contract·The Metropolitan District·Connecticut

COLLINSVILLE WATER TREATMENT FACILITY BUTTERFLY VALVES AND ACTUATOR UPGRADE, 11% SLBE

$1MAwarded 11/18/2019Single Award
Contract source

Description

This contract calls for the replacement and upgrade of butterfly valves and associated actuators at the Collinsville Water Treatment Facility in Canton, Connecticut. The work includes demolition of existing valves, piping, and equipment, and installation of new electrically‑actuated valves as detailed in Section 01010 of the bid documents. Bidders must hold a current DAS Contractor Pre‑qualification Certificate for Water Treatment Plants and submit a 10 % bid security. A mandatory pre‑bid conference and site tour were required on July 15, 2019, and all questions were to be submitted via email by July 19, 2019. The award was made on November 18, 2019, with award documents posted to registered vendors only. • Scope: full replacement of butterfly valves and actuators, including demolition, material procurement, installation, and testing. • Requirements: DAS pre‑qualification for water‑treatment plants, 10 % bid security, attendance at mandatory pre‑bid conference/site tour. • Timeline: bid due July 30, 2019; award November 18, 2019; work to commence after award (exact start/finish dates not disclosed).

Attached files

The award documents live at the source — open the contract source above to download them.

Key dates

Bids closed
7/30/2019
Intent to award
11/18/2019
Awarded
11/18/2019
Starts
11/18/2019

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Water Management and Sanitation
NAICS
237120
Solicitation №
2019B-15

Set-asides

Small Business, Partial Set-Aside

Contract value

$1,000,000

The bid documents do not disclose the contract dollar value. However, similar valve‑replacement projects at municipal water‑treatment facilities typically range from $500 k to $2 M, depending on the number of valves, site conditions, and engineering services. The requirement for a 10 % bid security suggests a total contract value in the high‑hundreds‑of‑thousands to low‑millions. Based on the size of the Collinsville facility and the scope (full valve and actuator replacement), a reasonable mid‑point estimate is approximately $1 M.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Contra Costa Water District·California

Top match · 72%

City of Brentwood Water Treatment Plant Actuator and Control System Upgrades

Closes 11/10/2026Opened 10/1/2026

City of Charlotte·North Carolina

70% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

City of Long Prairie·Minnesota

68% match

Long Prairie, City of Water Treatment Plant Rehabilitation 25X.138024

Closes 11/18/2026Opened 10/29/2026

City of Charlotte·North Carolina

68% match

McDowell Creek Wastewater Treatment Plant Clarifier & Pumping Station

Rolling / TBD closeOpened 1/1/2027

City of Hollywood·Florida

68% match

Water Treatment Plant Maintenance Package 'B'; Project No. 25-4262

Closes 12/3/2026Opened 10/26/2026

Eastern Municipal Water District·California

67% match

Purified Water Replenishment SJV Advanced Water Purification Facility

Closes 11/19/2026Opened 8/25/2026

Dickenson County·Virginia

67% match

Dickenson County Public Service Authority Haysi Wastewater Treatment Plant

Closes 11/16/2026Opened 9/30/2026

Maryland Environmental Service - Procurement Division·Maryland

67% match

Dorsey Run Wastewater Treatment Plant Minor Upgrades - MBE 20%

Closes 11/6/2026Opened 9/23/2026

Santa Clara Valley Water District·California

67% match

Pacheco Pumping Plant Pump 12 Rebuild

Closes 12/8/2026Opened 10/20/2026

City of Holly Grove·Arkansas

67% match

City of Holly Grove Water System Improvements – Water Tank Rehabilitation and Plant Building Modification

Closes 11/18/2026Opened 10/25/2026

City of Hollywood·Florida

67% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026

City of Douglas·Wyoming

67% match

Sanitary Sewer and Misc WWTP Improvements Project

Closes 11/3/2026Opened 10/16/2026

Maryland Carroll County Government - Procurement·Maryland

67% match

Design Upgrades to the Sykesville Pumping Station

Closes 12/9/2026Opened 10/22/2026

City of Albert Lea·Minnesota

67% match

Mrs. Gerry's Kitchen – Chloride Reduction Project – BMI Project No. 25X.140602

Closes 11/19/2026Opened 10/21/2026

Carroll County·Maryland

67% match

Design Upgrades to the Sykesville Pumping Station

Closes 12/9/2026Opened 10/21/2026

U.S. Department Of The Interior·California

67% match

Y--LB Lateral Water Line and Facilities Replacement for Wastewater System

Closes 11/11/2026Opened 10/27/2026

Saline County Waterworks and Sanitary Sewer Public Facilities Board·Arkansas

66% match

Saline County Waterworks & Sanitary Sewer Public Facilities Board – WWTP Improvements

Closes 11/12/2026Opened 10/18/2026

U.S. Department Of Veterans Affairs·Delaware

66% match

Z1DA--Local | 460-26- 4-5074-0108 | 460-26-999 | Condenser Water Piping Modification | (VA-26-00077929)

Closes 11/20/2026Opened 10/21/2026

North Carolina Town of Cary·North Carolina

66% match

Swift Creek Pump Station PLC Improvements

Closes 11/9/2026Opened 10/15/2026

U.S. Department Of Defense·Pennsylvania

66% match

48--VALVE,BUTTERFLY

Closes 11/6/2026Opened 9/30/2026

Town of Eatonville·Florida

66% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

Village of Cary·Illinois

66% match

Foxford Hills Lift Station No. 1 Partial Rehabilitation - Level Controls, Rails, Valves and Control Enclosure

Closes 11/9/2026Opened 10/15/2026

Upper Occoquan Service Authority·Virginia

66% match

UOSA IFB 27-02 P2NR+ Construction

Closes 11/4/2026Opened 8/24/2026

City of Charlotte·North Carolina

66% match

Franklin WTP 24 MOD Improvements

Rolling / TBD closeOpened 7/1/2026

Santa Clara Valley Water District·California

66% match

San Francisco Intertie Valves and Joints

Closes 11/12/2026Opened 8/18/2026