Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Transportation RFPsTransportation and Public Transit Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More transportation and public transit bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Transportation and Public Transit
  5. ›Electric Bus Charging Infrastructure - Design and CEI

Lee County·Florida

Electric Bus Charging Infrastructure - Design and CEI

Closes 10/30/2025$500k – $2MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Lee County Procurement Management is seeking a consultant to design and provide construction engineering and inspection (CEI) services for electric bus charging infrastructure. The project involves designing and installing electric bus charging stations at the LeeTran headquarters site. The consultant will be responsible for providing all necessary labor, services, materials, equipment, tools, consumables, transportation, skills, and incidentals required for the project. The scope of work includes technical specifications and a scope of work that can be obtained from the Lee County Procurement Management website. • The project is funded in part or in whole by the Federal Transit Administration (FTA) and requires compliance with federal grant requirements. • The consultant must be registered in the E-Verify system and provide acceptable evidence if needed. • The consultant must disclose any lobbying activities and certify that they are not barred from doing business with the federal government due to past misconduct, fraud, or legal violations. • The consultant must provide a copy of their registration from the Florida Department of State, Division of Corporations, and certify that they are authorized to conduct business in the state of Florida. • The consultant must provide three reference surveys and disclose any negligence or breach of contract litigation.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Sara Long(Procurement Management)

[email protected]

(239) 533-8886

Key dates

Opened
9/26/2025
Questions due
10/22/2025
Closes
10/30/2025

Last updated

Details

Type
Request for Proposal
Industry
Transportation and Public Transit
NAICS
541330
Solicitation №
CN250069SML

Budget estimate

$500,000 – $2,000,000

The budget for this project can be estimated based on the scope of work and the requirements of the project. The project involves designing and installing electric bus charging stations, which can be a complex and costly process. The cost of the project will depend on the number of charging stations, the type of equipment used, and the labor costs. A rough estimate for the project could be between $500,000 and $2 million, considering the complexity of the project and the requirements of the scope of work.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Kansas City Area Transportation Authority·Missouri

Top match · 77%

Design-Build Battery Electric Bus (BEB) Charging Infrastructure and Canopy

Closes 12/29/2026Opened 11/16/2026

NYS Rockland County·New York

74% match

ELECTRIC VEHICLE CHARGING INFRASTRUCTURE STUDY

Closes 11/6/2026Opened 9/22/2026

Department of Education·South Carolina

72% match

Electric Bus Charging Stations - Colleton - Paving

Closes 11/10/2026Opened 10/19/2026

SC Department of Education·South Carolina

72% match

Electric Bus Charging Stations - Colleton - Electrical

Closes 11/10/2026Opened 10/19/2026

SC Department of Education·South Carolina

72% match

Electric Bus Charging Stations - Newberry - Electrical

Closes 11/5/2026Opened 10/13/2026

City of Pinole·California

71% match

Design Services for Electric Vehicle Charging Infrastructure for the City of Pinole

Closes 11/4/2026Opened 10/7/2026

SC Department of Education·South Carolina

71% match

Electric Bus Charging Stations - Newberry - Paving

Closes 11/5/2026Opened 10/13/2026

New York City Department of Transportation·New York

70% match

Request for Information (RFI) Regarding Electric Vehicle Charging Incentive Program

Closes 11/30/2026Opened 9/14/2026

SC Department of Education·South Carolina

70% match

Electric Bus Charging Stations - Union - Electrical

Closes 11/5/2026Opened 10/13/2026

Massachusetts Department of Transportation·Massachusetts

69% match

613689 CAMBRIDGE FAP No. HPP/STP-003E(014)X Neighborhood Electric Vehicle Charging Infrastructure

Closes 11/10/2026Opened 9/14/2026

SC Department of Education·South Carolina

68% match

Electric Bus Charging Stations - Chesterfield - Electrical

Closes 11/10/2026Opened 10/13/2026

Public Service Company of New Mexico·New Mexico

68% match

RFI: Transportation Electrification Program (TEP)

Closes 11/6/2026Opened 9/1/2026

Department of Education·South Carolina

68% match

Electric Bus Charging Stations - Union - Paving

Closes 11/5/2026Opened 10/12/2026

Port of Stockton·California

68% match

EPA Customer Side Design & Engineering

Closes 11/12/2026Opened 10/8/2026

Lee County·Florida

68% match

Installation of Two ChargePoint Electric Bus Chargers

Closes 11/3/2026Opened 10/2/2026

SC Department of Education·South Carolina

68% match

Electric Bus Charging Stations - Chesterfield - Paving

Closes 11/10/2026Opened 10/14/2026

Lee County·Florida

68% match

Installation of Two ChargePoint Electric Bus Chargers

Closes 11/3/2026Opened 10/2/2026

Michigan Lansing School District·Michigan

68% match

SO-1862 Electrical Infrastructure/install chargers/bess

Closes 11/12/2026Opened 10/19/2026

Connecticut Energy & Environmental Protection·Connecticut

67% match

Electric Vehicle Charging Station Upgrades

Closes 11/13/2026Opened 10/23/2026

City of Long Beach·California

67% match

R-7282 Fleet Services EV Charging Depot

Closes 11/20/2026Opened 10/14/2026

City of Tamarac·Florida

67% match

EV CHARGING STATION INFRASTRUCTURE- DC FAST CHARGING STATIONS

Closes 11/17/2026Opened 10/15/2026

Virginia Port Authority·Virginia

67% match

RFP 2027-10-VPA Battery Electric Locomotive Charging Solution

Closes 11/17/2026Opened 10/13/2026

Port of Stockton·California

67% match

EPA Customer Side Design & Engineering

Closes 11/12/2026Opened 10/8/2026

Lee County·Florida

67% match

Installation of Two ChargePoint Electric Bus Chargers

Closes 11/3/2026Opened 10/2/2026

City of Cincinnati·Ohio

67% match

EV Charging Rec Centers PID 122816

Closes 11/6/2026Opened 10/16/2026