The South Jersey Port Corporation is soliciting bids to design, supply, and install a new electric‑vehicle (EV) charging infrastructure at the Balzano Marine Terminal on Clinton Street, Camden, NJ. The work includes the provision of two 200 kW DC fast chargers for lift‑truck fleets, installation of a 1 MVA transformer, associated switchgear, panels, conduit, grounding systems, and related civil work. The project requires compliance with PSE&G‑approved equipment, New Jersey electrical codes, and BABA requirements for the charger equipment. A detailed bid form specifies a 180‑day construction schedule and requires numerous certifications, insurance, and affirmative‑action documentation.
• Supply and install two 200 kW EVDC‑200 BABA fast chargers plus associated 30‑ft charging cables.
• Provide transformer, main disconnect, metering cabinet, and two distribution panels (480 V and 208 V) with all required conduit, grounding, and supports.
• Perform all civil and electrical work, including trenching, conduit installation, transformer pad foundations, testing, energization, and final commissioning.
• Submit extensive compliance documentation (bid bond, insurance, small‑business set‑aside, prevailing‑wage, equal‑pay, and various certifications).