This contract concerns the comprehensive upgrade of Basin 12’s sewer capacity in Sub‑Basin P005, encompassing extensive underground utility work, concrete pavement, curb‑gutter construction, site preparation, and traffic/erosion control. The bid tabulation lists 73 line items ranging from confined‑space compliance and performance bonds to trenching, pipe installation, manhole replacement, and asphalt patching, with a total engineer’s estimate of roughly $3.32 M and total bids received of about $3.23 M. The project reflects a large‑scale municipal water‑utility infrastructure improvement, requiring expertise in civil construction, underground pipe installation (PVC, HDPE, CIPP), concrete work, and associated site‑work logistics. Key points include:
• 73 distinct work items (site prep, trenching, pipe & manhole work, concrete & asphalt surfaces).
• Estimated budget $3.3 M; actual bids $3.2 M, indicating modest cost savings.
• Bid opening occurred on 9 Oct 2025; no award or vendor information disclosed.
• Requires compliance with confined‑space entry, performance bonds, and traffic control measures.