The University of North Florida (UNF) Board of Trustees is seeking a licensed Mechanical Contractor or certified General Contractor to remove and replace the existing roof-mounted 180 Ton air-cooled chiller at the Museum of Contemporary Art Jacksonville (MOCA). The project includes all labor, materials, and supervision required for the removal and replacement of the chiller. The contractor will provide a 5-year total warranty, including refrigerant, parts, and labor. The project is expected to be completed within 30 calendar days of the notice to proceed, with final completion within 15 calendar days of substantial completion. The contract type is Firm Fixed Price, and the funding source is the Coronavirus State Fiscal Recovery (CSFR) funds.
• The project requires the contractor to provide a certified, cashier’s or treasurer’s check, bank draft, bank official check, or bid bond in the amount of 5% of the bid amount.
• The contractor must comply with the Public Entity Crimes section of the document and all other applicable laws and regulations.
• The University reserves the right to accept or deny any subcontractor for the work described in the solicitation.
• The contractor must provide a completed copy of the Subconsultant/Subcontractor Form, even if no subcontractors are utilized on the project.
• The contractor must provide a completed copy of the Bid Form, which must be signed and uploaded to the UNF Bid Portal.