The contract is for the replacement of the HVAC cooling systems and exterior site lighting at the Wyoming Pioneer Home. The project consists of materials and labor to replace the existing HVAC cooling systems and a portion of the exterior site lighting, along with wiring and control upgrades. The contract was awarded to Sheet Metal Specialties, a Wyoming Resident, with a total bid amount of $1,012,259.00. The project includes several alternates, including the replacement of multi-circuit condensing units, exterior site lighting work, and work associated with RTU 1 thru 5 and condensing unit replacement for single circuit split systems.
• The contract includes a mandatory pre-bid meeting attendance requirement.
• The contract requires a bid bond, which was provided by the awarded vendor.
• The contract has several addenda, including Addendum #1.
• The contract includes a negotiated amount for the base bid and alternates.