Metropolitan Community College (MO) issued a Request for Proposal (RFP) 22-7495 for the purchase and installation of a new projection and audio system in The Arbor Room at the MCC Maple Woods campus. The project was later canceled due to unforeseen circumstances. The RFP included a pre-bid conference and several addendums with drawings and floor plans. The college intended to notify vendors if the project is put out for bid again in the future. Key aspects of the project include:
• Purchase and installation of a new projection and audio system
• Location: The Arbor Room (CC110) at the MCC Maple Woods campus
• Pre-bid conference was held on January 19, 2022
• Several addendums with drawings and floor plans were released
• Project was canceled due to unforeseen circumstances