The College of New Jersey awarded a phased, full‑building audio‑visual systems integration for Forcina Hall. The contract covers the purchase, installation, programming, and warranty of displays, PTZ cameras, speaker arrays, microphone systems, Crestron control panels, network switches, and related cabling, coordinated with the general contractor Imperial Construction. Work is divided into multiple phases spanning 2025‑2026, with strict timing, prevailing‑wage compliance, and a single‑lump‑sum pricing structure. Two firms share the award: Washington Professional Systems (approximately $1.5 M) and Imperial Construction and Electric, Inc. (approximately $2.0 M). Key requirements include NJ electrical licensing, 100 % performance bond, 10 % bid guarantee, and a $25 k allowance.
• Full‑building AV integration for classrooms, corridors, and digital signage
• Phased schedule with start early 2025, substantial completion by mid‑2026, final close‑out Sep‑2026
• Prevailing‑wage, small‑business (25 % SBE) and DVOB (3 %) set‑aside requirements
• Single‑lump‑sum contract, $3.5 M total award, extensive warranty and maintenance obligations.